Performance engineering
For equipment operating below requirements: energy consumption above design, skewed flow distribution, emissions over the limit, or output stuck at a ceiling. It starts from measurements on the real system.
Equipment performance assessment
Before simulation, the actual operating point of the equipment must be established against design. This is the lowest-cost step and the basis for deciding whether to proceed.
Collecting operating data
Operating logs, on-site readings, design parameters, equipment drawings and piping ISOs. CFDWAYS specifies the minimum list if the data is incomplete.
Heat & mass balance
A balance of the whole system to locate the losses; in many cases the bottleneck lies outside the equipment originally suspected.
The performance gap
The result is quantified: the gap to design, the share recoverable through operation, and the share that requires hardware intervention.
Energy & process optimization
Most of the wasted energy in a plant lies in how the machines work together under real operating conditions.
- Operating window: the range of temperature, flow rate and feed ratio that gives the highest efficiency while keeping the equipment safe and staying under the emission limit.
- Waste-heat recovery: which heat sources are still usable, and which recovery schemes are feasible in terms of both layout and economics.
- Lower fan and pump consumption: duct pressure losses, flow-guiding devices, the fan operating point — usually the fastest improvement available.
- KPIs tracked continuously: after the improvement, the indicators go onto a monitoring platform to track whether the gain is sustained over time.
Diagnosis & root-cause tracing
Sensors show the outcome, not the cause. Simulation acts as a microscope, revealing zones that no instrument can reach.
Common symptoms
- Temperature differences between zones inside the same equipment
- Corrosion or fouling concentrated on one side
- Pressure loss higher than the design calculation
- Flue gas treatment underperforming despite sufficient reagent
- Vibration, localized wear, unusually short material life
How CFDWAYS works
- Building the model on the real geometry and operating conditions
- Calibrating against design data or measurements before concluding anything
- Locating the cause by quantitative criteria, not by impression
- Separating causes in design, in operation, and in the fuel or feedstock
Equipment & system retrofit
This step turns the diagnosis into a concrete hardware change that can be ordered and installed.
Propose the options
A few feasible retrofit options, each stating the scope of intervention and a relative cost estimate.
Verify on the model
Every option is re-run on the same validated model and KPIs compared before/after — the decision rests on data.
Detailed design
Fabrication drawings for the chosen option; manufacturing and supply are carried out with partners.
Post-installation tracking
Measurements after the retrofit are compared with the model prediction, closing the loop and calibrating for later projects.